Project Details
Air Products Labs
Design-build for two labs (New Products Development) and (Analytical Analysis) totaling over 6,000 sf. New 50 ton heating/ cooling capacity make up air, (10) fume hoods, dry agent fire suppression, stainless steel lab casework and benches, glove boxes, chemical containment storage area, stainless steel pipe and distribution for hydrogen/ nitrogen system, DI water, organic and inorganic fume hood exhaust system and scrubber system tie-ins. All finishes, including epoxy flooring, vinyl rock ceiling tile, paint, new walls and other systems components in an H3 occupancy environment.
Previous
Next
View Other Projects